Tools
This is a reference catalogue. Tools cannot be configured or run from this page.
Get Ads Analytics
PINTEREST_ADS_GET_ANALYTICSGet synchronous Pinterest Ads performance metrics for an advertiser or selected campaigns, ad groups, or ads over a date range.
Get Metrics Ready State
PINTEREST_ADS_GET_METRICS_READY_STATECheck whether Pinterest conversion and non-conversion metrics are finalized for a UTC report date before relying on analytics results.
Get Targeting Options
PINTEREST_ADS_GET_TARGETING_OPTIONSGet Pinterest's valid targeting values for a targeting type, such as age buckets, gender, locale, location, interests, or keywords.
List Ad Accounts
PINTEREST_ADS_LIST_AD_ACCOUNTSList advertiser accounts the connected Pinterest user owns or can access, including the IDs needed by all other Ads tools.
List Ad Groups
PINTEREST_ADS_LIST_AD_GROUPSList ad groups for an advertiser, filter by parent campaigns, or look up specific ad groups by ID.
List Ads
PINTEREST_ADS_LIST_ADSList ads for an advertiser, filter by one hierarchy level, or look up specific ads by ID. Archived and draft ads must be requested explicitly with entity_statuses.
List Campaigns
PINTEREST_ADS_LIST_CAMPAIGNSList campaigns for an advertiser, or look up specific campaigns by ID using campaign_ids. Archived and draft campaigns must be requested explicitly with entity_statuses.
Update Ad Groups
PINTEREST_ADS_UPDATE_AD_GROUPSRename, pause, or resume up to 30 existing ad groups. Setting status to ACTIVE can restart delivery and incur spend under existing budgets. Budget, bid, targeting, schedule, and restricted-setting changes are not exposed.
Update Ads
PINTEREST_ADS_UPDATE_ADSRename, pause, or resume up to 30 existing Pinterest ads. Setting status to ACTIVE can restart delivery and incur spend under existing budgets. Creative, Pin, destination, tracking, and disclosure changes are not exposed.
Update Campaigns
PINTEREST_ADS_UPDATE_CAMPAIGNSRename, pause, or resume up to 30 existing campaigns. Setting status to ACTIVE can restart delivery and incur spend under existing budgets. Budget, schedule, objective, archive, and restricted-setting changes are not exposed.