Data & Analytics

Hypotize MCP

Manage Hypotize growth experiments through Hypotize's hosted MCP server: projects, tags, scoring frameworks, ideas, experiments, votes, outcomes, action plans, comments and learnings.

Tools

This is a reference catalogue. Tools cannot be configured or run from this page.

  • Hypotize experiment action plan set

    Replace the whole action plan of an experiment: the task list to run the test, each item with title, estimated_hours, optional assignee_id and completed. It is the only tool that edits the action plan; hypotize_experiment_update does not touch it. Send every item to keep: pass the id of an existing item to keep it, leave id out for a new one, and items left out are removed. Assignees must be members of the project. Returns the plan and its total hours. Changes the experiment updated_at; optimistic concurrency (STALE_EXPERIMENT). Requires the editor or owner role in the project; a contributor or viewer gets INSUFFICIENT_ROLE with required_roles.

  • Hypotize experiment record outcome

    Record how an experiment ended, atomically: result (Win, Lose or Neutral), actual_result, learning_summary, and optionally next_steps, evidence_links, winner_variant, ended_at and final_status. It is the tool that writes the result directly (hypotize_experiment_transition only fills an empty result to match a final status, and import takes it from the row). Usually called in Analyzing with final_status, which closes the test in the same call; hypotize_experiment_transition is then not needed. The whole outcome is replaced: omitting next_steps or evidence_links clears them, while an omitted winner_variant or ended_at keeps its current value, so to correct a single outcome field use hypotize_experiment_update. final_status must be a move allowed from the current status (INVALID_STATUS_TRANSITION) and match the result: Win with Winning, Lose with Failed, Neutral with Inconclusive (OUTCOME_STATUS_MISMATCH); Learned accepts any result. Closing a test can award activity points (XP) to the experiment owner. Optimistic concurrency (STALE_EXPERIMENT). Requires the editor or owner role in the project; a contributor or viewer gets INSUFFICIENT_ROLE with required_roles.

  • Hypotize experiment transition

    Move an experiment to another status. It writes no definition or outcome text. Forward moves: Idea, Approved, Ready, Running, Analyzing, then Winning, Failed, Inconclusive or Learned; from Winning, Failed or Inconclusive to Learned; any status except Archived to Archived. Archived cannot be left through this tool (the web Archive page restores it). From any other status, moving back to any earlier step except Idea is allowed; moving back to an open status clears the result, and moving back before Analyzing also clears ended_at. To close a test, call hypotize_experiment_record_outcome instead: it writes the result and the outcome text and sets the final status in one call. This tool reaches Winning, Failed, Inconclusive or Learned only when actual_result and learning_summary are already recorded; if result is still empty, Winning, Failed and Inconclusive set it to Win, Lose or Neutral, while Learned requires an existing result (OUTCOME_REQUIRED). A move that is not allowed gives INVALID_STATUS_TRANSITION. Ready needs hypothesis, success_metric, target_segment, start_date and due_date (EXPERIMENT_NOT_READY). A final status needs actual_result and learning_summary (OUTCOME_REQUIRED) and a matching result (OUTCOME_STATUS_MISMATCH). A forward move out of Running sets ended_at when it is empty; backward moves clear it as described above. Closing or starting a test can award activity points (XP) to the experiment owner, as in the web app. Optimistic concurrency (STALE_EXPERIMENT). Requires the editor or owner role in the project; a contributor or viewer gets INSUFFICIENT_ROLE with required_roles.

  • Hypotize experiment update

    Update the editable fields of an experiment in any status, Ideas included: definition fields, and the outcome text (actual_result, learning_summary, next_steps, evidence_links, winner_variant) to correct one of them. It never changes status, result or the action plan: use hypotize_experiment_transition to move the status, hypotize_experiment_record_outcome to record how the test ended, and hypotize_experiment_action_plan_set for the task list. Optimistic concurrency: pass expected_updated_at from the last read, or get STALE_EXPERIMENT. A closed experiment keeps a non-empty actual_result and learning_summary (OUTCOME_REQUIRED). Requires the editor or owner role in the project; a contributor or viewer gets INSUFFICIENT_ROLE with required_roles.

  • Hypotize profile update

    Set the current user's own display name and, optionally, their role at the company (company_role), as teammates see them in Hypotize. company_role is optional; pass null to clear it. Changes only the current user's profile.

  • Hypotize project update

    Update project context (name, website, industry, audience, writing language). Requires the editor or owner role in the project; a contributor or viewer gets INSUFFICIENT_ROLE with required_roles.

  • Hypotize vote upsert

    Upsert the current user's vote in the experiment's framework (ICE impact/confidence/ease, PIE potential/importance/ease, RICE reach/impact/confidence/effort, or a custom framework's dimensions) and atomically recalculate priority. Other keys give INVALID_DIMENSIONS. Changes the experiment updated_at. A first vote awards the voter activity points (XP), as in the web app. Requires the contributor, editor or owner role.