Atlassian MCP
Tools
This is a reference catalogue. Tools cannot be configured or run from this page.
Manageconfluenceapproval
ATLASSIAN_MCP_MANAGE_CONFLUENCE_APPROVALRequest, decide, cancel, clear, or update a Confluence page approval. Approvals support pages only, not live docs or blog posts.
Updatecapacityplanallocations
ATLASSIAN_MCP_UPDATE_CAPACITY_PLAN_ALLOCATIONSAllocate people to a single work item over one or more time periods in Individual Capacity Planning. USE WHEN the user asks to put someone on a work item for a period, to change how much of their time it takes, to book leave, or to clear an allocation. Every person in contributorDataIds is assigned to the work item automatically, so it does not need to be assigned to them first, and every allocation is applied to every person - the number of writes is contributorDataIds x allocations, which must not exceed 100. Only one work item per call. Resolve a non-project work ARI with listCapacityPlanNonProjectWork rather than fabricating one. Each allocation covers a period and carries the TOTAL effort for that period, of any length. To express a RATE, send one allocation per interval: "2 days a week for three weeks" is three allocations of 2, NOT one allocation of 2 spanning three weeks. A single allocation spanning all of September means "this much effort across September", which the plan spreads over the weeks in it. Re-running the same periods REPLACES those allocations rather than adding to them, so the call is safe to repeat; set value to 0 to clear a period. Because value is the TOTAL for the period and re-running replaces it, any RELATIVE change - "add a day", "bump Chris to 3 days", "halve it" - needs the current figure first. Call getCapacityPlanAllocations with the same contributorDataIds and workDataIds, the same date window, and expand: ["contributions"], then send the new total. Writing the relative amount directly overwrites the existing allocation instead of adding to it. An absolute request ("put Chris on PROJ-42 at 50% in September") needs no prior read. This does NOT add anyone to a capacity plan and cannot create work items - contributors and work items are global, so an allocation written here shows up on every plan they belong to, matching the UI. Add 'contributions' to expand to return the value written per period and confirm what landed, 'contributorAggregations' for each person's total contribution and availability across ALL their work in the allocated window (use this to report whether the change has pushed someone over capacity), and 'workAggregations' for the work item's total effort across ALL contributors. Both aggregations come back as separate top-level objects. Omit expand when a simple confirmation is enough - each value costs extra work upstream. Capacity plans assume a baseline 40-hour working week, so 5 DAYS, 40 HOURS, and 100 PERCENTAGE are all the same amount - say so when reporting days or percentages.