Productivity & Projects

Basecamp

Project management and team collaboration tool by 37signals

Tools

This is a reference catalogue. Tools cannot be configured or run from this page.

  • Trash Recording

    Tool to mark a recording as trashed in a Basecamp project. Use when you need to move a recording to trash without permanently deleting it.

  • Update Recording Subscription

    Tool to update recording subscriptions by adding or removing subscribers. Use when you need to manage who receives notifications for a specific recording. At least one of subscriptions or unsubscriptions must be provided.

  • Update Schedule Entry

    Tool to update an existing schedule entry in a Basecamp schedule. Use when you need to modify an entry's title, times, description, or participants. Omitted parameters remain unchanged.

  • Update Schedule Configuration

    Tool to update a schedule configuration in a Basecamp project. Use when you need to change whether the schedule includes due assignments from to-dos, cards and steps.

  • Reposition To-Do List Group

    Tool to reposition a to-do list group within its parent to-do list in a Basecamp project. Use when you need to change the order of to-do list groups by moving a group to a specific position.

  • Update To-Do in Bucket

    Tool to update an existing to-do in a Basecamp project. Use when you need to modify a to-do's content, description, assignees, dates, or notification settings. Note: Pass all existing parameters along with those being updated to prevent clearing values.

  • Reposition To-Do

    Tool to change the position of a to-do within its list in a Basecamp project. Use when you need to reorder to-dos by moving a specific to-do to a new position.

  • Update Upload in Bucket

    Tool to update an existing upload in a Basecamp project bucket. Use when you need to modify an upload's description or filename. Omitted parameters remain unchanged.

  • Update Vault Title

    Tool to update a vault's title in a Basecamp project. Use when you need to rename a vault within a specific project bucket.

  • Update Webhook

    Tool to update an existing webhook in a Basecamp project. Use when you need to modify the webhook's URL, event types, or active status.

  • Update Project

    Tool to update an existing project's name, description, access policy, or schedule in Basecamp. Use when you need to modify project details or settings. Note: name parameter is required; schedule dates must be provided as pairs (both start_date and end_date).

  • Grant or Revoke Project Access

    Tool to grant or revoke project access for users in Basecamp. Use when you need to add existing users to a project, create new users with access, or remove users from a project. At least one of grant, revoke, or create must be provided.

  • Update Template

    Tool to update a template's name and description in Basecamp. Use when you need to modify template metadata. Omitted parameters remain unchanged.

  • Record Project Visit

    Record the current user's visit to a project, moving it to the front of their recent projects. Repeating a visit refreshes the same entry. Visits to archived or trashed projects are accepted but are not recorded. An inaccessible project returns 404. Success returns no content.

  • Remove Account Logo

    Remove the connected Basecamp account's logo. Requires an administrator or account owner. Success returns no content.

  • Remove Project Logo

    Remove a project's logo; requires permission to edit the project. Also succeeds when the project already has no logo. After removal, single-project responses omit logo and the logo download endpoint returns 404 Not Found.

  • Remove Project Wallpaper

    Remove a project's wallpaper; requires permission to edit the project. People and agents who can edit the project can remove its wallpaper; everyone else receives 403 Forbidden. Returns no content, including when the project already has no wallpaper.

  • Reorder Up Next

    Move an already-prioritized assignment to a new position in your Up Next list. The recording must already be prioritized, and the position must fall within the current list. A repeated move can have a different effect if the list has changed, so inspect the current ordering before retrying a failed request.

  • Reposition Card Step

    Tool to change the position of a step within a card. Use when you need to reorder steps in a card table card by moving a step to a specific position.

  • Reposition Subtask

    Move a subtask to a new position among its siblings. Supply the subtask ID and its desired 1-based position. The subtask remains under its current parent; a successful move returns no content.

PreviousPage 14 / 17Next